Dryden Road rotary shed (44-bale). Tap a job. The wash runs on the automatic controller. Each card has a spot to add a short video. Items marked TO CONFIRM still need the manager to fill in.
Video: to be added (paste a YouTube or Drive link here).
TO CONFIRM: not documented for the rotary. The manager to record the start-up sequence: vat taps, filter sock, cooler, platform start, cup removers, teat spray.
Video: to be added (paste a YouTube or Drive link here).
TO CONFIRM: not documented for the rotary. Record how colostrum and treated-cow milk are kept out of the vat and the calves, and how to switch the plant back. Treated milk must never reach the vat or the calves.
Video: to be added (paste a YouTube or Drive link here).
The controller runs a set program each milking. Weekly schedule below.
Monday: AM Hot Alkali (P1), PM Cold Acid (P2).
Tuesday: AM Hot Acid (P3), PM Cold Acid (P4).
Wednesday: AM Hot Acid (P5), PM Cold Acid (P6).
Thursday: AM Hot Acid (P7), PM Cold Acid (P8).
Friday: AM Hot Acid (P9), PM Cold Acid (P10).
Saturday: AM Hot Acid (P11), PM Cold Acid (P12).
Sunday: AM Hot Acid (P13), PM Cold Acid (P14).
Pattern: one hot wash each morning (alkali on Monday, acid the rest of the week), and a cold acid wash every afternoon. The controller doses and recycles automatically.
Video: to be added (paste a YouTube or Drive link here).
P1: Hot Alkali.
P2: Hot Acid.
Video: to be added (paste a YouTube or Drive link here).
Normal use: all taps along the front of the calf pens off (up is off); milk tap on (tap 1); milk pump on at the wall switch. Always turn it off at the wall when finished.
Weekly flush of the milk lines: pump off; milk tap off (tap 1); drain the pipes into buckets; high-pressure water tap on (tap 2); open the pen taps one at a time to flush; high-pressure tap off (tap 2); drain; close the pen taps; milk tap back on (tap 1).